Friday, September 10, 2010

strategy !!


the red marks show the position of the installation.





Strategy
Start building the structure on Saturday afternoon at 2 p.m.
Takes around 10 minutes to build each structure.
Total number of structures = 4 ( 2 big ones, and 2 small ones )
Minimum number of people required =
   -  12 for installing structure (3 for each structure)
   -    3 of us will be mapping and standby.
   -     1 person will be on top floor of the metro station taking photographs.
   -     Others will join the mob.



PROCEDURE
STEP 1: installation
       TIME: 2pm
       DATE: 11th sep 2010
       DAY: Saturday
      1)  4 groups of 3 each will start installing the structure.
       2)  it will be completed in 10 min.
STEP 2: painting the structure.
      1) we start painting the components meanwhile 2 students from mob join         
          each structure which would invite people to engage in the activity.
       2)Then we ask the people who joined in to get them clicked with the
           structure.
STEP 3: disassembling  the structure  and dispersing.
          TIME : 2:40pm

No comments:

Post a Comment